Lab C Status Report #5 April 9th 2010


Accomplished this week
  • Finished initial prototypes

  • Tested initial prototypes

  • Refined Prototypes and Tested again.

  • Defined roles for the final report.

  • Started and completed certain parts of the final report

  • Completed filming (Group 2)

  • Completed Survey (Group 2)

  • Finished cards for Board Game (Group 5)

  • Tested Game with half the game cards (Group 5)

  • Completed Transfer Package (Group 8)



To Be accomplished next week

  • Finish all testing and finalize any last adjustments

  • Present Prototype at Open House

  • Finish Final Report

  • Complete a professional looking prototype of the game board. (Group 7)

  • Test Games and Instructional Packages amongst peers (Group 8)

  • Finish editing of film material (Group 4)


Additional Thoughts

The package is coming together nicely and most groups are on schedule to finish the prototypes and final reports on time. Overall the entire lab group has worked together very well with lots of patient discussion amongst various groups to reach a desirable outcome for everyone. The team has met personal expectations despite a challenging task, the final prototype might not be of quality to implement in the real world but within the time frame provided a group of first years students have done very well.


Thursday, April 8, 2010

Lab B - Week 5 Update



It is almost the end of the year and we are making our final push!

Accomplishments for the week:

The groups have completed their respective games
Regarding the final product:

-Game introduction has been created
-Primary screen in the form of the map of the world is functional
-The games are being merged by a selected group of individuals


Both the poster and manual design team was formed
Some groups are already working towards the final report
The deadlines have been set regarding the above


To be accomplished next week:

Have the final prototype ready for testing by the instructors
-Further testing of prototype to have it ready for open house

The design manual and poster should be ready
Final report should be completed
Prepare an oral presentation!


Some issues:

Initially it was difficult to merge the games together. We were saved by the export/import functions that the GM has which allowed us to compile the games together without doing it manually(IE copy/paste). Still some minor issues with it which shouldn't hold us back.

Good Luck to everyone!

Tuesday, April 6, 2010

Lab A Accomplished This Week - Week Four

As a lab it was decided that:
  • The game must be designed in a more linear fashion; this means that when the user passes a quiz it will unlock one module, instead of opening multiple rooms at once. The order of the rooms is as follows:
  1. Simple Math
  2. Data Analysis
  3. Units and Conversions
  4. Geometry
  5. Algebra/Patterns
  6. Coordinate Systems
  7. Trigonometry
  8. Functions
  • Whose laptops will be used for the demonstration at the open house presentation
  • Each main game designer from each individual group will be expected to help the main compiler put the game together after each individual module is complete
  • Team management group will put together the User Manual
  • One team member from each team (other than PM Members) will be selected to help put together the poster for the open house presentation (group of 7)

Friday, April 2, 2010

D Lab Update 4



Accomplished This Week

This week was focused on programming and developing questions. Each group was building a solid foundation for their program while researching to find questions to incorporate into the game.

Next Week

Next week all of the groups will be finishing their sections of the game. The project management team will have to meet and discuss possible ways to put all of the sections together into one game. By the end of next week our lab should have a completed section of the game from each group and an idea of how they are all going to come together into one final product.

Lab A - March 28

To be accomplished next week:
- Teams are expected to have their sections completed at most by the end of the week of April 9th
- Compilation to begin shortly after all sections have been received
- Testing is to be done individually by every group before submission of sections
- The Poster Team is to begin preparing a layout and theme, as well as preparing colour schemes etc.
- The Design Manual team is yet to be assigned, contributors of which, will begin working on their assigned parts
- A Presentation Team has to be assigned, contributors of which, will also begin working on their assigned parts
- Final polishing of each section’s plot as well as backgrounds, sprites etc.

Lab A Week 4 Gannt Chart

Reb Lab B - Weekly Status Report #4

Due to the long weekend this week, there was only one short lab this week. As a result, most of the teams did not have too much class time to work on the actual game. However, the work that was accomplished this week will be outlined below as well. Also included are the tasks that are to be accomplished next week as well as a graph that outlines the progress of the lab.

Accomplishments this week:

Individual Teams:

  • The final sprites have been implemented into each of the games
  • Most teams have completed the first few levels of their game
  • The individual game designs and concepts have mostly been finalized and are simply waiting for completion
  • Some teams have assigned tasks to team members to work on the game during the long weekend
  • Teams have set out testing criteria and will be able to test once their game is complete
  • Some teams have actually began to conduct and record some forms of testing
  • Some groups have assigned work packages to each team member for the upcoming final report

Lab as a whole:
  • The lab nominated four individuals to represent the lab at the Open House Presentation
  • A Game Assembly team was formed who will be responsible for compiling the individual games into the final integrated game
  • One person from each group has been assigned to be in the Poster team; this team will be responsible for completing the poster that will presented at the Open House
  • One person from each team has been assigned to work on designing the 'Instruction Manual' for the final game
To be accomplished next week:
  • Each team is expected to have their individual game completed so that the integration process can begin; a date will be set during class as to which date the game is to be completed and sent to the Game Assembly Team
  • Testing is to be conducted and finished next week
  • Most teams will be starting to work on the Final Report
  • The Poster team and Design Manual team will begin to work on their respective parts; a date is to be set during class as to when each of the components should be completed
  • Presentation Team will begin writing their presentation for the Open House
  • Come up with a catchy name for the final game


NOTES:
Some of the individuals in the lab that are working on creating the actual game for their team have expressed some concern as to having some difficulty with working on certain elements of Game Maker 8.0. There seems to be a lack of instruction on how to utilize the program to accomplish some of the tasks that are required for building the game.

If anyone working on the game in Red Lab B is having any difficulty, please be sure to contact someone in the Game Assembly team for assistance:
Brandon C. (gyrosese@hotmail.com)
Dan S. (dan_the_man_sander@gmail.com)
Mitch W. (yamahaguy_630@hotmail.com)