As a Lab:

ACCOMPLISHED THIS WEEK
  • Assigned who will be included in the poster group
  • Discussed poster design, and what materials to use
  • Pooled money to acquire GameMaker Pro for import-export feature
  • Found out how to create save points in the game once it is compiled
  • Came up with a naming system to ensure that sprites and rooms are named intelligently for compilation time
  • Assigned quick keys; S = save, Q = quit
  • Redesigned quiz room to resemble main room, with separate doors for each subjects quizzes
  • Decided who would be in the group to write the design manual
  • Read over design manual requirements, and divided responsibilities among group members
  • Figured out how to incorporate 8 direction movement into the game, and figured out how to incorporate boundaries into the game
  • Figured out how to do multiple choice questions for quizzes
  • Worked on game design and quizzes, set due date for all games (Thursday April 8, 2010 in the am)
  • Every group recorded testing data for their final report
  • Came up with game title – “Math Master”
  • Every group discussed outline of final report and divided roles

TO BE DONE NEXT WEEK
  • Finish making presentation poster
  • Have Open House presentation ready
  • Game prototype will be all compiled and will be able to be played
  • User/Design Manual to be completed and ready for Open House
  • Present final product at the Open House on Thursday April 15th
  • Have our last discussion about final report and finish/submit