This was the final week for the Mustard Seed project, which meant a lot of work had to be finished.
During the short lab this week, all of the groups had their prototypes finished, and were just finishing up testing reports. The teams presented the prototypes to the lab on Tuesday. All of the prototypes were a success and they were all easily related which was a very important feature. This being the final lab, all of the teams were dividing up the final report.
The representatives for the open house were chosen by the lab on Tuesday. We decided to break the presentation into one hour blocks, for a total of 4 representatives. The Open house went very well, all the Lab coaches and the Mustard Seed representatives were very impressed with the professional look of our prototypes as well as the prototypes themselves.
There are not a great deal of changes that we would have liked to make, but as always it would have been better if we had done more testing on the prototypes which was limited by the time issue.
All in all the project was a success, every member of the lab will leave this class with a new understand of teamwork and what it is to be a real engineer.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment